Presentation in Joint workshop of COST TU Action 1402 and 1406Date: March 01, 2017The talk discussed the potential of using multi-criteria decision analysis method for bridge prioritization. The link to recorded talk can be found at following link.Share on Twitter Facebook Google+ LinkedIn Previous Next